The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Power generation300 MW · Proposed/reported scope, not measured output or evidence of operation. EIA plant 67649 identifies Cypress Creek Renewables’ proposed 300 MW Amerada solar generator in Freestone County, with approvals pending and July 2029 planned operation. · source