Opened 2026-11-02; states roughly $200 million private investment.
Opened 2026-11-02.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
150 MW (PJM request AF2-415 maximum facility output); press reports 150 MW / 600 MWh.
2024-05-13
Interconnection study; construction and operation unverified
PJM request AF2-415: Bergen 138 kV; developer name Juno Power Management LLC (PJM study). Press names Elevate Renewables as developer.
“Juno Power Management LLC”
Interconnection study published; not a commissioning date
NJ BPU awards Two Rivers Energy Storage incentives (GSESP Phase 1 Tranche 1)
“The winners are Woods Landing Storage LLC (200 MW, Sayreville, Middlesex County), Two Rivers Energy Storage LLC (150 MW, Ridgefield, Bergen County)”
Power storage150 MW · Proposed battery maximum facility output in MW; no verified MWh duration or commercial-operation day. · source