January 1, 2027 is the EIA-860M proposed completion date.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Planned operation 2027-01; preliminary survey estimate, not a capacity commitment or achieved milestone.
“1 2027 (U) Under construction, less than or equal to 50 percent complete”
EIA reports (U) Under construction, less than or equal to 50 percent complete. A planned operation date is not evidence of commercial service.
“(U) Under construction, less than or equal to 50 percent complete”
Technology: Solar Photovoltaic. Plant 68828; selected generator IDs 1. Scope is the named solar generating component, not unrelated units at the site.
“Solar Photovoltaic”
Reported operation forecast
“1 2027 (U) Under construction, less than or equal to 50 percent complete”
Power generation74.5 MW · 74.5 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output. Operation forecast 2027-01. Scope: 1. Annual output is not reported by this inventory; no annual energy inferred. · source