Construction research 2026-10-24: Epoch’s[1] 2025-10-08 observation documents the identified building scope complete or operating, using physical observations or explicit delivery rather than an elapsed target date. Completed is limited to that scope. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “Site already complete.” Dated observation 2025-10-08; future trajectory rows and modeled costs are distinguished from this physical milestone.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Microsoft Project Osmium in Cumming, Iowa, United States is a frontier AI data center campus operated by Microsoft / OpenAI reaching 190 MW of power capacity and 155,634 H100-equivalent AI accelerators. One building reportedly contained roughly 25,000 A100s used by OpenAI to train GPT-3.5.
Epoch’s 2025-10-08 observation documents the identified building scope complete or operating, using physical observations or explicit delivery rather than an elapsed target date. Completed is limited to that scope. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget.