The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
MEININGER’s May 2022 release announces 25 May. Hospitality ON’s[3] 25 May 2022 report explicitly says the hotel opened its doors on 25 May; Hotelbau[4] corroborates the completed opening. Current operator address Rosa-Parks-Ring 1 replaces the older project address Bürgermeister-Smidt-Straße 15.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
A budget hotel and hostel hybrid beside Bremen’s main railway station and long-distance bus terminal, with private family rooms and a shared guest kitchen.[1]
Book a whole private family room and confirm beds, occupancy and cot needs. Dormitory beds are separate products. The communal guest kitchen, game zone and shared lounge offer useful facilities between outings; check equipment, storage and house rules.[1]
The railway and bus terminals are nearby. Plan walking or public-transport routes to the old town, especially with children or luggage. Compare the complete private-room cost, taxes, breakfast, nearby parking, luggage storage and cancellation terms for the actual dates.[1]
Guests praise transport access, cleanliness and value. Accounts also describe ventilation noise, varied staff responses and service concerns. These are guest reports; ask about room position and ventilation if noise matters. The rubric is a snapshot drawn from a small review sample, rather than a live rating.[5]
The hotel opened on 25 May 2022, as explicitly reported by Hospitality ON alongside the operator’s announced date. The formal opening is distinguished from earlier construction plans.[3]
MEININGER’s launch release describes 126 rooms and 378 beds within the completed HIGHeleven development. These are opening-era figures, separate from later directory counts. No hotel-specific construction budget was verified; costs for the broader bus-terminal, parking and office development are not assigned to this hotel.[2]