The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
A year only, so its last day, per aramcostadium.com[3][5]: "Opening in 2026 as the first of its kind in the region" and "Expected Completion Year: 2026"; CBNME[4] (21 July 2026) has it "on track for a 2026 completion".
Groundbreaking in early 2024 with a completion target of late 2026; owned by ROSHN Group, operated by Aramco under a 25-year concession; SAR 3.7 billion; a minor fire on 16 January 2026 contained within ten minutes.[1]
The stadium's event page for its first listed AFC Asian Cup Saudi Arabia 2027 fixture, Australia vs Singapore, "WHERE: ARAMCO STADIUM[1][5]", doors "TBA" (it gives 5 January 2027, which conflicts with the tournament's 7 January start).
Newest progress report: the "$1 billion venue" is "on track for a 2026 completion ahead of its role in the 2027 AFC Asian Cup"; 11,000+ workers, 10 million safe hours, BESIX-ALBAWANI JV, Populous design.[1]
Aramco's stadium company, 13 April 2026: "Aramco Stadium[1][3] is set to open this year with a capacity of 47,000 seats"; 800,000 m2 complex, ~130,000 m2 of park, fully air-conditioned; AFC Asian Cup 2027 and FIFA World Cup 2034.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
More than 11,000 workers on site at the July 2026 report; historical construction headcount, not permanent stadium jobs.
“More than 11,000 workers are currently on site”
47,000 seats.
“47,000-seat venue”
2026 in the July report; no opening inferred from ticket listings or the forecast.
“on track for a 2026 completion”
Active stadium construction documented
“Construction on the new Aramco Stadium”
Completion forecast
“2026 completion”
Planned design figure · 47,000-seat stadium.