The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Estimated: October 6 reporting attributes a late-2028 construction-completion target to JEC CEO Fabien Toscano. December 31 is a late-year marker, not an announced completion day.
Opened report directly attributes latest construction target to JEC CEO; stage observation is older than October 9.[1]
Wikipedia confirms the tower 'is expected to be completed as early as 2028,' giving August 2028 as the estimate and noting it had reached 113 floors by 2 September 2026 - directly matching the pin's stored completion date.
Newsweek's own reporting (published 1 June 2026) states the Jeddah Tower 'is expected to be completed by August 2028' with construction reaching Core Level 69 - an exact match for the pin's stored completion date.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Construction reported above floor 118 and over 470 m on October 9, 2026.
“9 October 2026”
Planned design figure · 157 planned floors per Jeddah Economic Company's CEO (Gulf News); The National says 167 and Khaleej Times 168. Height over 1,000 m.