Happened as dated, per the source: "President Franklin D. Roosevelt dedicates dam September 30th."
Infobox construction cost of Hoover Dam (1931 budget)[1]
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Concrete gravity-arch dam and hydroelectric station.
“Concrete gravity-arc”
The lower Colorado River flooded destructively: the 1905-1907 break into the Imperial Valley created the Salton Sea and the 1916 Gila River flood swept into Yuma Valley. Reclamation proposed controlling the river with a high dam in Boulder Canyon, and the seven basin states signed the Colorado River Compact in 1922.
How: The Boulder Canyon Project Act authorised the dam; contracts for the sale of electrical energy covered dam and power plant financing, and the Hoover Powerplant became the world largest hydroelectric facility at 704,800 kW.
Power generation2.08 GW · Status: production. 2,078.8 MW installed nameplate in cited plant inventory. Opening 1936; turbine commissioning continued afterward. · source