Anunciada
Energy: battery storage · Verificado em 2026-10-30
Apenas a etapa informada é destacada. Os números e datas distinguem planos de resultados demonstrados.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hamilton","summerNetMW":200.0”
2027-01-31; requested date only, not an achieved opening.
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hamilton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3296","queueDate":"2024-04-17T04:00:00+00:00","inService":"2027-01-31T05:00:00+00:00"”
Este pin acompanha as notícias: mostra o que se sabe agora, e aqui está o que mudou e o que motivou a mudança.
Editadopor @ThePinGang
Broad Reach Power development of the Hamilton Clean Energy Storage Facility in Hamilton County, Illinois. TheJ3296 is a 200 MW / 800 MWh grid-scale energy storage project provides critical capacity, frequency response, and local peak load shaving across the Ameren Illinois service territory within the MISO wholesale electricity market.battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a planning date.
Broad Reach Power advanced engineering and county development reviews for the Hamilton Clean Energy Storage Facility. Features a 200 MW / 800 MWh four-hour utility-scale battery energy storage system. RepresentsJ3296 is a 200 MW battery storage interconnection request in Hamilton, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-01-31; this is a 210 million USD capital project supporting grid reliability in southern Illinois. Connects to Ameren Illinois transmission lines serving the wholesale MISO electricity market. Delivers fast-ramping frequency response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hamilton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Editadopor @ThePinGang
… response, voltage support, and local peak load shaving. Timeline: planned project targeting commercial operation in January 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Editadopor @ThePinGang
Fotos de leitores, separadas das mídias com fontes do pin. Avalie o que você comeu ou viu e, em um pin de restaurante, marque os pratos direto na sua foto.
A primeira entrada é sempre a fonte do pin. A confiança geral é uma média ponderada de quanto cada referência sustenta os horários de início e fim usados acima; uma referência conta metade a cada 180 dias a mais em relação à mais recente.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
Título original: Hamilton: 200 MW Battery Interconnection Request J3296
Power storage200 MW · J3296: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-01-31. Not current measured generation; No annual energy or battery MWh inferred. · source