Anunciada
Energy: battery storage · Verificado em 2026-10-30
Apenas a etapa informada é destacada. Os números e datas distinguem planos de resultados demonstrados.
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"TWINKLETOWN 230 KV","summerNetMW":250.0”
2025-02-22; requested date only, not an achieved opening.
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; TWINKLETOWN 230 KV.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
Este pin acompanha as notícias: mostra o que se sabe agora, e aqui está o que mudou e o que motivou a mudança.
Editadopor @ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Twinkletown Clean Energy Storage Center in DeSoto County, Mississippi. DeliveringJ2091 is a 250 MW / 1,000 MWh of advanced battery storage connected to the 230 kV bulk electric system, the facility provides vital peak shaving and voltage regulation for the rapidly expanding Memphis metropolitan industrial corridor.interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental and engineering reviews for the Twinkletown Clean Energy Storage CenterJ2091 is a 250 MW battery storage interconnection request in DeSoto County, Mississippi. Delivers 250 MW / 1,000 MWh of advanced utility-scale battery storage. Represents a 250 million USD clean energy capital development in northern Mississippi. Interconnects directly to theDeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date. The point of interconnection is TWINKLETOWN 230 kV bulk transmission system along State Highway 302. Supplies essential peak shaving and voltage regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.KV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Editadopor @ThePinGang
… regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.
Editadopor @ThePinGang
Fotos de leitores, separadas das mídias com fontes do pin. Avalie o que você comeu ou viu e, em um pin de restaurante, marque os pratos direto na sua foto.
A primeira entrada é sempre a fonte do pin. A confiança geral é uma média ponderada de quanto cada referência sustenta os horários de início e fim usados acima; uma referência conta metade a cada 180 dias a mais em relação à mais recente.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
Título original: Twinkletown: 250 MW Battery Interconnection Request J2091
Power storage250 MW · J2091: 250 MW requested battery storage. Queue status: Done. Requested date: 2025-02-22. Not current measured generation; No annual energy or battery MWh inferred. · source