A primeira entrada é sempre a fonte do pin. A confiança geral é uma média ponderada de quanto cada referência sustenta os horários de início e fim usados acima; uma referência conta metade a cada 180 dias a mais em relação à mais recente.
A data salva é um rastreamento estimado ou marcador de trajetória de capacidade, não um dia de abertura exato verificado. O estado de construção segue o escopo físico datado citado; nenhuma conclusão é inferida a partir de metas decorridas.
Construction research 2026-10-24: Epoch’s[1] 2026-06-13 observation documents remaining physical construction/installation for this named buildout. In Progress does not complete earlier operating buildings or future capacity. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “all the yard work directly surrounding it” Dated observation 2026-06-13; future trajectory rows and modeled costs are distinguished from this physical milestone.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
| Estima-se que o edifício 1 esteja operacional até o final do ano, a julgar pelo edifício atualmente concluído, a subestação de energia concluída a sudoeste. O trabalho/construção do pátio circundante… |
| 2027-12-31 | A Core Scientific espera a entrega inicial do segundo edifício Muskogee de 82,5 MW não alugado no quarto trimestre de 2027. Ainda não assinou contrato para ter GPUs CoreWeave, mas pode mudar no futur… |
|---|
Notas de imagens de satélite da Epoch AI, em ordem de data. · fonte
Physical-stage observation dated 2026-06-13. Campus buildout remains under construction; already operating buildings do not complete the remaining work. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“all the yard work directly surrounding it”
Epoch’s dated 2026-06-13 assessment: all the yard work directly surrounding it Campus buildout remains under construction; already operating buildings do not complete the remaining work.
“all the yard work directly surrounding it”
AI data-center compute infrastructure. Hardware inventory remains unpublished or not verified in this project assessment.
“AI data center”
Epoch dated observation: Core Scientific, CoreWeave, and Port Muskogee publicly announce…
“Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center.”
Epoch assessment: Based on satellite imagery, Building 1 has completed construction, with…
“Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators.”
Título original: CoreWeave Muskogee OK AI Data Center Buildout
A observação de 13/06/2026 da Epoch documenta a construção/instalação física restante para este edifício nomeado. Em andamento não conclui edifícios operacionais anteriores ou capacidade futura. As contagens de potência e acelerador permanecem estimativas da Epoch, e não uma classificação certificada pelo operador. Os custos de capital modelados em dólares de 2025 incluem hardware de computação e não são um orçamento de construção nativo da fonte.
Campus de inferência e treinamento de IA de fronteira em hiperescala rastreado pela Epoch AI com pegadas de satélite anotadas (6 partes físicas).