Construction research 2026-10-24: Epoch’s[1] 2026-05-18 observation documents remaining physical construction/installation for this named buildout. In Progress does not complete earlier operating buildings or future capacity. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “generators/cooling equipment being installed” Dated observation 2026-05-18; future trajectory rows and modeled costs are distinguished from this physical milestone.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
| 2027-07-01 | Data operacional prevista para os restantes edifícios rastreados (11 e 1-4) nos três campi. Esta estimativa é baseada nos edifícios anteriores que levaram cerca de 1,5 anos desde a estrutura de aço a… |
|---|
Notas de imagens de satélite da Epoch AI, em ordem de data. · fonte
Physical-stage observation dated 2026-05-18. Campus buildout remains under construction; already operating buildings do not complete the remaining work. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“generators/cooling equipment being installed”
Epoch’s dated 2026-05-18 assessment: generators/cooling equipment being installed Campus buildout remains under construction; already operating buildings do not complete the remaining work.
“generators/cooling equipment being installed”
Epoch estimates AI hardware: Amazon Trainium2, Nvidia H100, Nvidia H200, and Nvidia B200 chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Amazon Trainium2, Nvidia H100, Nvidia H200, and Nvidia B200 chips.”
Epoch dated observation: Land clearing begins for Buildings 5-9 (eastern campus).
“Land clearing begins for Buildings 5-9 (eastern campus).”
Epoch assessment: Satellite imagery shows Building 1 in the northern campus still appears…
“Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter.”
Título original: AWS New Albany AI Data Center Buildout
A observação de 18/05/2026 da Epoch documenta a construção/instalação física restante para este edifício nomeado. Em andamento não conclui edifícios operacionais anteriores ou capacidade futura. As contagens de potência e acelerador permanecem estimativas da Epoch, e não uma classificação certificada pelo operador. Os custos de capital modelados em dólares de 2025 incluem hardware de computação e não são um orçamento de construção nativo da fonte.
Campus de inferência e treinamento de IA de fronteira em hiperescala rastreado pela Epoch AI com pegadas de satélite anotadas (31 partes físicas).