A primeira entrada é sempre a fonte do pin. A confiança geral é uma média ponderada de quanto cada referência sustenta os horários de início e fim usados acima; uma referência conta metade a cada 180 dias a mais em relação à mais recente.
A data salva é um rastreamento estimado ou marcador de trajetória de capacidade, não um dia de abertura exato verificado. O estado de construção segue o escopo físico datado citado; nenhuma conclusão é inferida a partir de metas decorridas.
Construction research 2026-10-24: Epoch’s[1] 2026-04-23 observation documents the identified building scope complete or operating, using physical observations or explicit delivery rather than an elapsed target date. Completed is limited to that scope. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Google’s actual Waltham Cross opening corroborates complete buildout, distinct from the generic 250MW seed value. Source quote: “Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image” Dated observation 2026-04-23; future trajectory rows and modeled costs are distinguished from this physical milestone.
Falta algo ou há um erro? Diga com suas palavras: um link que sustente este pin, uma data de início ou fim diferente e por quê, ou um fato que falta ou está errado. A IA confere isso com as fontes do pin, procura outras melhores e adiciona qualquer página que dê razão a você. As fontes do próprio pin continuam contando mais. Uma imagem que mostra outra coisa, ou mostra mal, também é analisada e rebaixada ou substituída.
Physical-stage observation dated 2026-04-23. Named completed buildings only; later expansion is not marked completed. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image”
Epoch’s dated 2026-04-23 assessment: Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image Named completed buildings only; later expansion is not marked completed.
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image”
Epoch estimates AI hardware: Google TPU v6e chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Google TPU v6e chips.”
Epoch dated observation: Land clearing begins (Sentinel-2 imagery).
“Land clearing begins (Sentinel-2 imagery).”
Epoch dated observation: Full buildout reconfirmed via high-resolution Pléiades-Neo satellite…
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image; no capacity change since September 2025.”
Título original: Google Waltham Cross AI Data Center — Completed Buildings
A observação da Epoch de 2026-04-23 documenta o âmbito do edifício identificado como completo ou em funcionamento, utilizando observações físicas ou entrega explícita em vez de uma data prevista decorrida. Concluído está limitado a esse escopo. As contagens de potência e acelerador permanecem estimativas da Epoch, e não uma classificação certificada pelo operador. Os custos de capital modelados em dólares de 2025 incluem hardware de computação e não são um orçamento de construção nativo da fonte. A abertura real de Waltham Cross do Google corrobora a construção completa, diferente do valor inicial genérico de 250 MW.
Campus de inferência e treinamento de IA de fronteira em hiperescala rastreado pela Epoch AI com pegadas de satélite anotadas (5 partes físicas).