Анонсирован
Energy: battery storage · Проверено 2026-10-30
Выделен только подтверждённый этап. Показатели и даты различают планы и подтверждённые результаты.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"IRONTON","summerNetMW":200.0”
2027-06-01; requested date only, not an achieved opening.
“"projectNumber":"J1902","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; IRONTON.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J1902","queueDate":"2021-08-13T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J1902","queueDate":"2021-08-13T04:00:00+00:00","inService":"2024-09-30T04:00:00+00:00"”
Этот пин следит за новостями: он показывает то, что известно сейчас, а здесь — что изменилось и почему.
Изменено@ThePinGang
DTE Electric transmission-tied development of the Ironton Clean Energy Storage Complex in Wayne County, Michigan. ProvidingJ1902 is a 200 MW / 800 MWh of lithium-ion battery storage, the system interfaces with southeastern Michigan's high-voltage industrial transmission grid to enhance power reliability and store zero-carbon electricity for automotive manufacturing centers.battery storage interconnection request in Wayne, MI. The grid operator lists its queue status as Active. The requested in-service date is 2027-06-01; this is a planning date.
DTE Electric submitted clean energy certificate documentation for the Ironton Clean Energy Storage ComplexJ1902 is a 200 MW battery storage interconnection request in Wayne County, Michigan. Delivers 200 MW / 800 MWh of lithium-ion energy storage capacity. Represents a 210 million USD clean energy capital development in the Detroit metropolitan area. Connects to southeastern Michigan's high-voltage industrial transmission network along Fort Street in Trenton. Strengthens power reliability and stores zero-carbon electricity for automotive manufacturing and clean technology industries. Timeline: planned project targeting commercial operation in June 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Wayne, MI. The grid operator lists its queue status as Active. The requested in-service date is 2027-06-01; this is a planning date. The point of interconnection is IRONTON. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Изменено@ThePinGang
… electricity for automotive manufacturing and clean technology industries. Timeline: planned project targeting commercial operation in June 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
Фото читателей, отдельно от медиа пина с источниками. Оцените то, что вы ели или видели, а в пине ресторана отметьте блюда прямо на своём фото.
Первая запись — всегда источник пина. Общая достоверность — это взвешенное среднее того, насколько каждый источник подтверждает указанные выше время начала и окончания; вес источника уменьшается вдвое за каждые 180 дней разницы с самым новым.
Чего-то не хватает или есть ошибка? Напишите своими словами: ссылку, подтверждающую этот пин, другую дату начала или окончания и почему, или факт, которого нет или который неверен. ИИ сверит это с источниками пина, поищет лучшие и добавит любую страницу, которая вас подтверждает. Собственные источники пина всё равно весят больше всего. Изображение, на котором показано что-то другое или показано плохо, тоже проверяется и опускается ниже или заменяется.
Оригинальное название: Ironton Energy Storage Complex: 200 MW Battery Interconnection Request J1902
Power storage200 MW · J1902: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-06-01. Not current measured generation; No annual energy or battery MWh inferred. · source