Анонсирован
Energy: battery storage · Проверено 2026-10-30
Выделен только подтверждённый этап. Показатели и даты различают планы и подтверждённые результаты.
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Wabaco","summerNetMW":250.0”
2030-06-30; requested date only, not an achieved opening.
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Wabaco.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Этот пин следит за новостями: он показывает то, что известно сейчас, а здесь — что изменилось и почему.
Изменено@ThePinGang
MISO regional transmission interconnection development of the Wabaco Clean Energy Storage Center in Wabasha County, Minnesota. SupplyingJ3848 is a 250 MW / 1,000 MWh of grid-scale battery storage along the Upper Mississippi River transmission corridor, the facility stores regional wind and solar generation to accelerate Minnesota's transition to 100% carbon-free electricity.interconnection request in Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date.
Xcel Energy filed regulatory petitions for the Wabaco Clean Energy Storage CenterJ3848 is a 250 MW battery storage interconnection request in Wabasha County, Minnesota. Supplies 250 MW / 1,000 MWh of four-hour grid-scale battery storage capacity. Represents an estimated 250 million USD clean energy infrastructure investment. Interconnects with MISO high-voltage transmission lines along the Upper Mississippi River corridor. Captures regional wind and solar generation to accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date. The point of interconnection is Wabaco. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Изменено@ThePinGang
… accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.
Фото читателей, отдельно от медиа пина с источниками. Оцените то, что вы ели или видели, а в пине ресторана отметьте блюда прямо на своём фото.
Первая запись — всегда источник пина. Общая достоверность — это взвешенное среднее того, насколько каждый источник подтверждает указанные выше время начала и окончания; вес источника уменьшается вдвое за каждые 180 дней разницы с самым новым.
Чего-то не хватает или есть ошибка? Напишите своими словами: ссылку, подтверждающую этот пин, другую дату начала или окончания и почему, или факт, которого нет или который неверен. ИИ сверит это с источниками пина, поищет лучшие и добавит любую страницу, которая вас подтверждает. Собственные источники пина всё равно весят больше всего. Изображение, на котором показано что-то другое или показано плохо, тоже проверяется и опускается ниже или заменяется.
Оригинальное название: Wabaco: 250 MW Battery Interconnection Request J3848
Power storage250 MW · J3848: 250 MW requested battery storage. Queue status: Active. Requested date: 2030-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source