Анонсирован
Energy: photovoltaic generation · Проверено 2026-10-30
Выделен только подтверждённый этап. Показатели и даты различают планы и подтверждённые результаты.
150 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Fayetteville Bee Hollow Road 138 kV Substation","summerNetMW":150.0”
2025-06-30; requested date only, not an achieved opening.
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Fayetteville Bee Hollow Road 138 kV Substation.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Этот пин следит за новостями: он показывает то, что известно сейчас, а здесь — что изменилось и почему.
Изменено@ThePinGang
MISO regional transmission interconnection development of the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Providing 150 MWac of renewable power, the utility-scale solar project feeds into Ameren Illinois transmission lines to power metro-east Illinois communities with clean, locally generated electricity.IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date.
Invenergy progressed development filings for the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Generates 150 MWac of clean photovoltaic power across the metro-east St. Louis region. Represents an estimated 170 million USD renewable infrastructure investment. Connects to Ameren Illinois transmission lines along the State Route 15 corridor. Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date. The point of interconnection is Fayetteville Bee Hollow Road 138 kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Изменено@ThePinGang
… Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.
Фото читателей, отдельно от медиа пина с источниками. Оцените то, что вы ели или видели, а в пине ресторана отметьте блюда прямо на своём фото.
Первая запись — всегда источник пина. Общая достоверность — это взвешенное среднее того, насколько каждый источник подтверждает указанные выше время начала и окончания; вес источника уменьшается вдвое за каждые 180 дней разницы с самым новым.
Чего-то не хватает или есть ошибка? Напишите своими словами: ссылку, подтверждающую этот пин, другую дату начала или окончания и почему, или факт, которого нет или который неверен. ИИ сверит это с источниками пина, поищет лучшие и добавит любую страницу, которая вас подтверждает. Собственные источники пина всё равно весят больше всего. Изображение, на котором показано что-то другое или показано плохо, тоже проверяется и опускается ниже или заменяется.
Оригинальное название: Bee Hollow: 150 MW Solar Interconnection Request J1311
Power generation150 MW · J1311: 150 MW requested photovoltaic generation. Queue status: Done. Requested date: 2025-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source