Анонсирован
Energy: photovoltaic generation · Проверено 2026-10-30
Выделен только подтверждённый этап. Показатели и даты различают планы и подтверждённые результаты.
199 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Robinsonville 230 kV","summerNetMW":199.0”
2024-12-01; requested date only, not an achieved opening.
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Robinsonville 230 kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2047","queueDate":"2021-08-12T04:00:00+00:00","inService":"2024-12-01T05:00:00+00:00"”
Этот пин следит за новостями: он показывает то, что известно сейчас, а здесь — что изменилось и почему.
Изменено@ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Robinsonville Clean Solar CenterJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto County, Mississippi. Delivering 199 MWac of clean photovoltaic power, the facility ties to the 230 kV electric grid to provide zero-carbon electricity to northwestern Mississippi communities and commercial developments.DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental assessments for the Robinsonville Clean Solar Center in DeSoto County, Mississippi. Deploys 199 MWac of clean photovoltaic power across northwest Mississippi. RepresentsJ2047 is a 199 MW photovoltaic generation interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2024-12-01; this is a 220 million USD clean energy infrastructure investment. Interfaces directly with theplanning date. The point of interconnection is Robinsonville 230 kV electric grid along the US Highway 61 corridor. Supplies zero-carbon electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Изменено@ThePinGang
… electricity to regional communities and growing commercial developments. Timeline: planned project targeting commercial operation in December 2027 (estimated) under regional grid interconnection queue and state regulatory schedules.
Изменено@ThePinGang
Фото читателей, отдельно от медиа пина с источниками. Оцените то, что вы ели или видели, а в пине ресторана отметьте блюда прямо на своём фото.
Первая запись — всегда источник пина. Общая достоверность — это взвешенное среднее того, насколько каждый источник подтверждает указанные выше время начала и окончания; вес источника уменьшается вдвое за каждые 180 дней разницы с самым новым.
Чего-то не хватает или есть ошибка? Напишите своими словами: ссылку, подтверждающую этот пин, другую дату начала или окончания и почему, или факт, которого нет или который неверен. ИИ сверит это с источниками пина, поищет лучшие и добавит любую страницу, которая вас подтверждает. Собственные источники пина всё равно весят больше всего. Изображение, на котором показано что-то другое или показано плохо, тоже проверяется и опускается ниже или заменяется.
Оригинальное название: Robinsonville: 199 MW Solar Interconnection Request J2047
Power generation199 MW · J2047: 199 MW requested photovoltaic generation. Queue status: Done. Requested date: 2024-12-01. Not current measured generation; No annual energy or battery MWh inferred. · source