ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed operating date from EIA-860M record via interconnection.fyi[1]; one tracker called the project under construction, unverified.Pure Hedge LLC lists a planned 90 MW solar-plus-battery plant in Windham County, Connecticut, with a proposed operating date of October 1, 2027. The battery portion is 20 MW per aggregator data. Storage energy capacity has not been published by a primary source.
1.00