ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
No energization date was found. The Energy Commission's Food Production Investment Program list describes agreement FPI-19-017 as having 'designed and installed a microgrid system' with a 12/31/2024 end date, so the date is the agreement end, the latest by which installation was done. Cleanview's[2] EIA row shows March 2027, which does not fit a project reported under construction in August 2021.Anheuser-Busch's Van Nuys brewery in Los Angeles has a rooftop solar and battery microgrid (4 MW solar and 1.8 MW / 4.14 MWh storage in the state filing, 1.6 MW in the federal EIA row) built with a 5.77M USD California Energy Commission grant plus 1.02M USD of company match; the Commission lists it as designed and installed with the agreement ending 31 December 2024.
1.00