CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Offshore Energy[4] reported Seaway Heavy Lifting took delivery of the new-build Oleg Strashnov crane vessel on 1 April 2011.Dutch shipbuilder IHC Merwede delivered the Oleg Strashnov, a 183-metre DP3 crane vessel able to lift 5,000 tonnes, to Seaway Heavy Lifting on 1 April 2011. The ship went on to become one of the most powerful monohull crane vessels used in offshore construction.
$500M
1.00