CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Offshore Energy's[4] photo report documented the Edda Freya construction vessel launching (hitting the water) at Kleven's yard on August 15, 2015.Shipbuilder Kleven Verft floated out the Edda Freya at its Ulsteinvik yard, a hybrid-powered subsea construction vessel later chartered to DeepOcean for pipeline and platform repair work like the mission the documentary follows.
≈$130.8M
1.00