CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CBC[2] News reported that ExxonMobil Canada confirmed the Hebron topsides and gravity base structure were joined at Bull Arm on Dec. 13-14, 2016.ExxonMobil Canada's Hebron project reached a major construction milestone when the platform's topsides were joined to its concrete gravity base structure at the Bull Arm fabrication site in Newfoundland. Italian heavy-lift specialist Fagioli had earlier installed the topsides' largest modules, including a 45,000-tonne utilities process module shipped from South Korea.
1.00