ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins94% CONFIDENCEOverall confidence: 94%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of January 2029 based on ERCOT[1][2] generator interconnection queue schedule and state regulatory filings.Palladium Energy is developing the 200M USD, 205.2 MW / 821 MWh four-hour utility battery energy storage system in Duval County, Texas, connecting to AEP Texas's South Texas transmission system.
$200M
1.00