CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins58% CONFIDENCEOverall confidence: 58%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA-based plant record (via interconnection.fyi[2]) lists Morris Solar as operational with a June 1, 2025 operating date; a local county article described testing in spring 2025.Morris Solar is a 250 MW solar plant operated by AES Clean Energy near Troy Mills in Adair County, Missouri, listed by EIA data as operational since June 1, 2025. It was developed beside the Zachary 345 kV substation area; the earlier 'Zachary Solar' name is a grid-queue label.
1.00