ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
First dated milestone is the 16 Dec 2025 county tabling (the application itself is only dated to 2025). The project never advanced to construction, so no completion target; the pin's 1 Aug 2026 date reflects the article month, not the project.[1]Soltier, LLC proposed a cryptocurrency mine with 27 new Antboxes on a 2.686-acre parcel at 133 Sullivan Street in Wysox Township, Bradford County (Towanda address). Wysox Township recommended denial, the county tabled the plan in December 2025, and the application was formally withdrawn on 22 June 2026. It is a crypto mine rather than a conventional data center, and no cost or MW figure was published.
1.00