ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 9 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
November 4, 2026 is the scheduled Board vote, not a verified vote result or construction start. Retained as an estimated future regulatory milestone.[1]California's State Water Resources Control Board is due to consider the final water right permit for the $6.2-6.8 billion Sites Reservoir on 4 November 2026. The Sites Project Authority moved the 1.5 million acre-foot project into its investment period after the revised draft permit, the last big step before construction.
$9.9B
1.00