Energy: battery storage · ตรวจสอบ 2026-10-30
เน้นเฉพาะขั้นตอนที่มีรายงาน ตัวเลขและวันที่แยกแผนออกจากผลที่พิสูจน์แล้ว
205 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Hazleton","summerNetMW":205.0”
2028-06-30; requested date only, not an achieved opening.
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Hazleton.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3780","queueDate":"2024-04-18T04:00:00+00:00","inService":"2028-06-30T04:00:00+00:00"”
หมุดนี้ติดตามข่าว แสดงสิ่งที่รู้ ณ ตอนนี้ และที่นี่คือสิ่งที่เปลี่ยนไปและสาเหตุ
แก้ไขแล้วโดย @ThePinGang
Alliant Energy / Interstate Power and Light development of the Hazleton Clean Energy Storage Center in Buchanan County, Iowa. TheJ3780 is a 205 MW / 820 MWh battery facility connects to the 345 kV Hazleton substation hub, providing essential grid flexibility, wind generation firming, and local transmission support across northeastern Iowa.battery storage interconnection request in Buchanan, IA. The grid operator lists its queue status as Active. The requested in-service date is 2028-06-30; this is a planning date.
Alliant Energy / Interstate Power and Light advanced engineering reviews for the Hazleton Clean Energy Storage Center. Features 205 MW / 820 MWh of grid-scale battery storage capacity in Buchanan County, Iowa. RepresentsJ3780 is a 205 MW battery storage interconnection request in Buchanan, IA. The grid operator lists its queue status as Active. The requested in-service date is 2028-06-30; this is a 220 million USD private clean energy infrastructure investment in eastern Iowa. Connects to the 345 kV Hazleton substation hub within the MISO transmission footprint. Enhances grid flexibility, firms regional wind generation, and reinforces transmission reliability. Timeline: planned project targeting commercial operation in June 2028 (estimated) under MISO interconnection queue and state regulatory schedules.planning date. The point of interconnection is Hazleton. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
แก้ไขแล้วโดย @ThePinGang
… firms regional wind generation, and reinforces transmission reliability. Timeline: planned project targeting commercial operation in June 2028 (estimated) under MISO interconnection queue and state regulatory schedules.
แก้ไขแล้วโดย @ThePinGang
ภาพจากผู้อ่าน แยกจากสื่อที่มีแหล่งอ้างอิงของพิน ให้คะแนนสิ่งที่คุณกินหรือเห็น และในพินร้านอาหารให้แท็กเมนูบนภาพของคุณได้เลย
รายการแรกคือแหล่งที่มาของหมุดเสมอ ความเชื่อมั่นโดยรวมคือค่าเฉลี่ยถ่วงน้ำหนักว่าแต่ละแหล่งอ้างอิงสนับสนุนเวลาเริ่มและสิ้นสุดด้านบนมากเพียงใด แหล่งอ้างอิงจะมีน้ำหนักลดลงครึ่งหนึ่งทุก ๆ 180 วันที่เก่ากว่าแหล่งล่าสุด
มีอะไรขาดหรือผิดไหม บอกด้วยคำพูดของคุณเอง: ลิงก์ที่สนับสนุนหมุดนี้ วันที่เริ่มหรือสิ้นสุดที่ต่างออกไปพร้อมเหตุผล หรือข้อเท็จจริงที่ขาดหรือผิด AI จะตรวจสอบกับแหล่งที่มาของหมุด ค้นหาแหล่งที่ดีกว่า และเพิ่มหน้าที่สนับสนุนคุณ แหล่งที่มาของหมุดเองยังคงมีน้ำหนักมากที่สุด รูปภาพที่แสดงสิ่งอื่นหรือแสดงได้ไม่ดีก็จะถูกตรวจสอบ และเลื่อนลงหรือแทนที่
ชื่อต้นฉบับ: Hazleton: 205 MW Battery Interconnection Request J3780
Power storage205 MW · J3780: 205 MW requested battery storage. Queue status: Active. Requested date: 2028-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source