200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"BEACON","summerNetMW":200.0”
2027-09-10; requested date only, not an achieved opening.
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; BEACON.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
หมุดนี้ติดตามข่าว แสดงสิ่งที่รู้ ณ ตอนนี้ และที่นี่คือสิ่งที่เปลี่ยนไปและสาเหตุ
แก้ไขแล้วโดย @ThePinGang
MISO regional transmission interconnection development of the Beacon Clean Energy Storage Facility in Mahaska County, Iowa. SupplyingJ3551 is a 200 MW / 800 MWh of lithium-ion energy storage, the facility connects to regional transmission lines near Oskaloosa to absorb surplus wind generation and strengthen southeastern Iowa electrical infrastructure.battery storage interconnection request in Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date.
Developers progressed regulatory filings for the Beacon Clean Energy Storage Facility near OskaloosaJ3551 is a 200 MW battery storage interconnection request in Mahaska County, Iowa. Supplies 200 MW / 800 MWh of grid-scale four-hour battery energy storage. Represents an estimated 210 million USD private clean power investment in southeastern Iowa. Connects to regional high-voltage transmission lines within the MISO market footprint. Absorbs surplus regional wind generation and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date. The point of interconnection is BEACON. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
แก้ไขแล้วโดย @ThePinGang
… and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
ภาพจากผู้อ่าน แยกจากสื่อที่มีแหล่งอ้างอิงของพิน ให้คะแนนสิ่งที่คุณกินหรือเห็น และในพินร้านอาหารให้แท็กเมนูบนภาพของคุณได้เลย
รายการแรกคือแหล่งที่มาของหมุดเสมอ ความเชื่อมั่นโดยรวมคือค่าเฉลี่ยถ่วงน้ำหนักว่าแต่ละแหล่งอ้างอิงสนับสนุนเวลาเริ่มและสิ้นสุดด้านบนมากเพียงใด แหล่งอ้างอิงจะมีน้ำหนักลดลงครึ่งหนึ่งทุก ๆ 180 วันที่เก่ากว่าแหล่งล่าสุด
มีอะไรขาดหรือผิดไหม บอกด้วยคำพูดของคุณเอง: ลิงก์ที่สนับสนุนหมุดนี้ วันที่เริ่มหรือสิ้นสุดที่ต่างออกไปพร้อมเหตุผล หรือข้อเท็จจริงที่ขาดหรือผิด AI จะตรวจสอบกับแหล่งที่มาของหมุด ค้นหาแหล่งที่ดีกว่า และเพิ่มหน้าที่สนับสนุนคุณ แหล่งที่มาของหมุดเองยังคงมีน้ำหนักมากที่สุด รูปภาพที่แสดงสิ่งอื่นหรือแสดงได้ไม่ดีก็จะถูกตรวจสอบ และเลื่อนลงหรือแทนที่
ชื่อต้นฉบับ: Beacon: 200 MW Battery Interconnection Request J3551
Power storage200 MW · J3551: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-09-10. Not current measured generation; No annual energy or battery MWh inferred. · source