Energy: battery storage · ตรวจสอบ 2026-10-30
เน้นเฉพาะขั้นตอนที่มีรายงาน ตัวเลขและวันที่แยกแผนออกจากผลที่พิสูจน์แล้ว
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"TWINKLETOWN 230 KV","summerNetMW":250.0”
2025-02-22; requested date only, not an achieved opening.
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Battery Storage; TWINKLETOWN 230 KV.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J2091","queueDate":"2022-01-11T05:00:00+00:00","inService":"2025-02-22T05:00:00+00:00"”
หมุดนี้ติดตามข่าว แสดงสิ่งที่รู้ ณ ตอนนี้ และที่นี่คือสิ่งที่เปลี่ยนไปและสาเหตุ
แก้ไขแล้วโดย @ThePinGang
Tennessee Valley Authority (TVA) transmission-interconnected development of the Twinkletown Clean Energy Storage Center in DeSoto County, Mississippi. DeliveringJ2091 is a 250 MW / 1,000 MWh of advanced battery storage connected to the 230 kV bulk electric system, the facility provides vital peak shaving and voltage regulation for the rapidly expanding Memphis metropolitan industrial corridor.interconnection request in DeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date.
The Tennessee Valley Authority (TVA) progressed environmental and engineering reviews for the Twinkletown Clean Energy Storage CenterJ2091 is a 250 MW battery storage interconnection request in DeSoto County, Mississippi. Delivers 250 MW / 1,000 MWh of advanced utility-scale battery storage. Represents a 250 million USD clean energy capital development in northern Mississippi. Interconnects directly to theDeSoto, MS. The grid operator lists its queue status as Done. The requested in-service date is 2025-02-22; this is a planning date. The point of interconnection is TWINKLETOWN 230 kV bulk transmission system along State Highway 302. Supplies essential peak shaving and voltage regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.KV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
แก้ไขแล้วโดย @ThePinGang
… regulation supporting the expanding Memphis metropolitan industrial corridor. Timeline: planned project targeting commercial operation in January 2028 (estimated) under regional grid interconnection queue and state regulatory schedules.
แก้ไขแล้วโดย @ThePinGang
ภาพจากผู้อ่าน แยกจากสื่อที่มีแหล่งอ้างอิงของพิน ให้คะแนนสิ่งที่คุณกินหรือเห็น และในพินร้านอาหารให้แท็กเมนูบนภาพของคุณได้เลย
รายการแรกคือแหล่งที่มาของหมุดเสมอ ความเชื่อมั่นโดยรวมคือค่าเฉลี่ยถ่วงน้ำหนักว่าแต่ละแหล่งอ้างอิงสนับสนุนเวลาเริ่มและสิ้นสุดด้านบนมากเพียงใด แหล่งอ้างอิงจะมีน้ำหนักลดลงครึ่งหนึ่งทุก ๆ 180 วันที่เก่ากว่าแหล่งล่าสุด
มีอะไรขาดหรือผิดไหม บอกด้วยคำพูดของคุณเอง: ลิงก์ที่สนับสนุนหมุดนี้ วันที่เริ่มหรือสิ้นสุดที่ต่างออกไปพร้อมเหตุผล หรือข้อเท็จจริงที่ขาดหรือผิด AI จะตรวจสอบกับแหล่งที่มาของหมุด ค้นหาแหล่งที่ดีกว่า และเพิ่มหน้าที่สนับสนุนคุณ แหล่งที่มาของหมุดเองยังคงมีน้ำหนักมากที่สุด รูปภาพที่แสดงสิ่งอื่นหรือแสดงได้ไม่ดีก็จะถูกตรวจสอบ และเลื่อนลงหรือแทนที่
ชื่อต้นฉบับ: Twinkletown: 250 MW Battery Interconnection Request J2091
Power storage250 MW · J2091: 250 MW requested battery storage. Queue status: Done. Requested date: 2025-02-22. Not current measured generation; No annual energy or battery MWh inferred. · source