ประกาศแล้ว
Energy: battery storage · ตรวจสอบ 2026-10-30
เน้นเฉพาะขั้นตอนที่มีรายงาน ตัวเลขและวันที่แยกแผนออกจากผลที่พิสูจน์แล้ว
250 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"Wabaco","summerNetMW":250.0”
2030-06-30; requested date only, not an achieved opening.
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; Wabaco.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3848","queueDate":"2024-12-31T05:00:00+00:00","inService":"2030-06-30T04:00:00+00:00"”
หมุดนี้ติดตามข่าว แสดงสิ่งที่รู้ ณ ตอนนี้ และที่นี่คือสิ่งที่เปลี่ยนไปและสาเหตุ
แก้ไขแล้วโดย @ThePinGang
MISO regional transmission interconnection development of the Wabaco Clean Energy Storage Center in Wabasha County, Minnesota. SupplyingJ3848 is a 250 MW / 1,000 MWh of grid-scale battery storage along the Upper Mississippi River transmission corridor, the facility stores regional wind and solar generation to accelerate Minnesota's transition to 100% carbon-free electricity.interconnection request in Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date.
Xcel Energy filed regulatory petitions for the Wabaco Clean Energy Storage CenterJ3848 is a 250 MW battery storage interconnection request in Wabasha County, Minnesota. Supplies 250 MW / 1,000 MWh of four-hour grid-scale battery storage capacity. Represents an estimated 250 million USD clean energy infrastructure investment. Interconnects with MISO high-voltage transmission lines along the Upper Mississippi River corridor. Captures regional wind and solar generation to accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.Wabasha, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-06-30; this is a planning date. The point of interconnection is Wabaco. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
แก้ไขแล้วโดย @ThePinGang
… accelerate Minnesota's statutory transition to 100% carbon-free electricity. Timeline: planned project targeting commercial operation in June 2030 (estimated) under MISO interconnection queue and state regulatory schedules.
ภาพจากผู้อ่าน แยกจากสื่อที่มีแหล่งอ้างอิงของพิน ให้คะแนนสิ่งที่คุณกินหรือเห็น และในพินร้านอาหารให้แท็กเมนูบนภาพของคุณได้เลย
รายการแรกคือแหล่งที่มาของหมุดเสมอ ความเชื่อมั่นโดยรวมคือค่าเฉลี่ยถ่วงน้ำหนักว่าแต่ละแหล่งอ้างอิงสนับสนุนเวลาเริ่มและสิ้นสุดด้านบนมากเพียงใด แหล่งอ้างอิงจะมีน้ำหนักลดลงครึ่งหนึ่งทุก ๆ 180 วันที่เก่ากว่าแหล่งล่าสุด
มีอะไรขาดหรือผิดไหม บอกด้วยคำพูดของคุณเอง: ลิงก์ที่สนับสนุนหมุดนี้ วันที่เริ่มหรือสิ้นสุดที่ต่างออกไปพร้อมเหตุผล หรือข้อเท็จจริงที่ขาดหรือผิด AI จะตรวจสอบกับแหล่งที่มาของหมุด ค้นหาแหล่งที่ดีกว่า และเพิ่มหน้าที่สนับสนุนคุณ แหล่งที่มาของหมุดเองยังคงมีน้ำหนักมากที่สุด รูปภาพที่แสดงสิ่งอื่นหรือแสดงได้ไม่ดีก็จะถูกตรวจสอบ และเลื่อนลงหรือแทนที่
ชื่อต้นฉบับ: Wabaco: 250 MW Battery Interconnection Request J3848
Power storage250 MW · J3848: 250 MW requested battery storage. Queue status: Active. Requested date: 2030-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source