2029-03-31 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
26INR0701 is a 989.1 MW photovoltaic generation interconnection request in Taylor, TX. The grid operator lists its queue status as SS Completed, FIS Started, No IA. The requested in-service date is 2029-03-31; this is a planning date.
J2519 is a 600 MW photovoltaic generation interconnection request in Richland, LA. The grid operator lists its queue status as Withdrawn. The requested in-service date is 2026-10-31; this is a planning date.
2029-04-17 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
25INR0588 is a 804.71 MW photovoltaic generation interconnection request in Mitchell, TX. The grid operator lists its queue status as SS Completed, FIS Started, No IA. The requested in-service date is 2029-04-17; this is a planning date.
Estimated: Allen Acres Solar EIA plant 70055 reporting point, Allen Township / Ransom area, LaSalle County, Illinois; approximate project contextAvangrid Power LLC
Arcadis อธิบายถึงวิทยาเขตซานโฮเซ่ที่วางแผนไว้ของ Terra Ventures ด้วยศูนย์ข้อมูล/โครงสร้างพลังงานขนาด 295,080 ตารางฟุต และโครงสร้างพลังงานขนาด 131,903 ตารางฟุตที่แยกต่างหาก บันทึกด้านสิ่งแวดล้อมในเดือนพฤศจิกายน 2025 ของ CPUC วาง Terra ไว้ที่ 4701 North First Street, San Jose เพื่อแก้ไขที่ตั้งเดิมของเมืองซานตาคลารา