Mục đầu tiên luôn là nguồn của ghim. Độ tin cậy tổng thể là trung bình có trọng số về mức độ mỗi tài liệu ủng hộ thời điểm bắt đầu và kết thúc được dùng ở trên; một tài liệu được tính giảm một nửa cho mỗi 180 ngày cũ hơn tài liệu mới nhất.
Documented physical milestone or dated progress/reporting marker. Period-end dates represent only the reported month/quarter; they do not invent an exact operation date. Source estimates are labelled and not treated as confirmed future opening dates.
The OPEC Fund’s project record publishes total project cost US$2,249.60 million. It covers the multipurpose dam programme, including water supply, irrigation and flood-control works, not just the power station. The Fund’s loan is not used as project cost. Mohmand multipurpose dam and hydropower project: 800 MW generating project rating. Operator-reported electric generating capacity; not annual energy production
WAPDA’s[4] current project page identifies 800 MW installed design capacity, ongoing construction, river diversion November 2024, dam impounding targeted late 2026 and electricity generation early 2028. Targets are not completion claims.
WAPDA[3] January 19, 2026 reports construction continuing on ten key sites.
Thiếu hay sai điều gì? Hãy nói bằng lời của bạn: một liên kết củng cố ghim này, một ngày bắt đầu hoặc kết thúc khác kèm lý do, hoặc một thông tin còn thiếu hay sai. AI đối chiếu với các nguồn của ghim này, tìm nguồn tốt hơn và thêm mọi trang ủng hộ bạn. Các nguồn của chính ghim vẫn được tính nhiều nhất. Hình ảnh thể hiện nội dung khác hoặc thể hiện kém cũng được xem xét, rồi bị hạ xuống hoặc thay thế.
The OPEC Fund’s project record publishes total project cost US$2,249.60 million. It covers the multipurpose dam programme, including water supply, irrigation and flood-control works, not just the power station. The Fund’s loan is not used as project cost.[2][3][4]
The OPEC Fund’s project record publishes total project cost US$2,249.60 million. It covers the multipurpose dam programme, including water supply, irrigation and flood-control works, not just the power station. The Fund’s loan is not used as project cost. Mohmand multipurpose dam and hydropower project: 800 MW generating project rating. Operator-reported electric generating capacity; not annual energy production[2]
WAPDA’s current project page identifies 800 MW installed design capacity, ongoing construction, river diversion November 2024, dam impounding targeted late 2026 and electricity generation early 2028. Targets are not completion claims.[3]
WAPDA January 19, 2026 reports construction continuing on ten key sites.[4]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.