Đã công bố
Energy: battery storage · Kiểm tra 2026-10-30
Chỉ giai đoạn được báo cáo được đánh dấu. Số liệu và ngày tháng phân biệt kế hoạch với kết quả đã chứng minh.
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"BEACON","summerNetMW":200.0”
2027-09-10; requested date only, not an achieved opening.
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; BEACON.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3551","queueDate":"2024-04-18T04:00:00+00:00","inService":"2027-09-10T04:00:00+00:00"”
Ghim này theo sát tin tức: nó cho thấy những gì hiện đã biết, và đây là điều đã thay đổi cùng nguyên nhân.
Đã chỉnh sửabởi @ThePinGang
MISO regional transmission interconnection development of the Beacon Clean Energy Storage Facility in Mahaska County, Iowa. SupplyingJ3551 is a 200 MW / 800 MWh of lithium-ion energy storage, the facility connects to regional transmission lines near Oskaloosa to absorb surplus wind generation and strengthen southeastern Iowa electrical infrastructure.battery storage interconnection request in Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date.
Developers progressed regulatory filings for the Beacon Clean Energy Storage Facility near OskaloosaJ3551 is a 200 MW battery storage interconnection request in Mahaska County, Iowa. Supplies 200 MW / 800 MWh of grid-scale four-hour battery energy storage. Represents an estimated 210 million USD private clean power investment in southeastern Iowa. Connects to regional high-voltage transmission lines within the MISO market footprint. Absorbs surplus regional wind generation and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Mahaska, IA. The grid operator lists its queue status as Active. The requested in-service date is 2027-09-10; this is a planning date. The point of interconnection is BEACON. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Đã chỉnh sửabởi @ThePinGang
… and provides dispatchable capacity during peak demand periods. Timeline: planned project targeting commercial operation in September 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
Ảnh của độc giả, tách biệt với phương tiện có nguồn của ghim. Hãy chấm điểm món bạn đã ăn hoặc thấy, và với ghim nhà hàng, gắn thẻ món ngay trên ảnh của bạn.
Mục đầu tiên luôn là nguồn của ghim. Độ tin cậy tổng thể là trung bình có trọng số về mức độ mỗi tài liệu ủng hộ thời điểm bắt đầu và kết thúc được dùng ở trên; một tài liệu được tính giảm một nửa cho mỗi 180 ngày cũ hơn tài liệu mới nhất.
Thiếu hay sai điều gì? Hãy nói bằng lời của bạn: một liên kết củng cố ghim này, một ngày bắt đầu hoặc kết thúc khác kèm lý do, hoặc một thông tin còn thiếu hay sai. AI đối chiếu với các nguồn của ghim này, tìm nguồn tốt hơn và thêm mọi trang ủng hộ bạn. Các nguồn của chính ghim vẫn được tính nhiều nhất. Hình ảnh thể hiện nội dung khác hoặc thể hiện kém cũng được xem xét, rồi bị hạ xuống hoặc thay thế.
Tiêu đề gốc: Beacon: 200 MW Battery Interconnection Request J3551
Power storage200 MW · J3551: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-09-10. Not current measured generation; No annual energy or battery MWh inferred. · source