290 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"GALLAGHER - TWINING 138.0kV","summerNetMW":290.0”
2028-11-01; requested date only, not an achieved opening.
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Solar; GALLAGHER - TWINING 138.0kV.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J3274","queueDate":"2024-04-15T04:00:00+00:00","inService":"2028-11-01T04:00:00+00:00"”
Ghim này theo sát tin tức: nó cho thấy những gì hiện đã biết, và đây là điều đã thay đổi cùng nguyên nhân.
Đã chỉnh sửabởi @ThePinGang
Consumers Energy regional transmission development of the Gallagher to Twining Clean Solar ProjectJ3274 is a 290 MW photovoltaic generation interconnection request in Ogemaw County, Michigan. Generating 290 MWac of renewable power, the facility connects to regional 138 kV transmission lines to inject clean electricity into the Michigan lower peninsula grid.Ogemaw, MI. The grid operator lists its queue status as Active. The requested in-service date is 2028-11-01; this is a planning date.
Consumers Energy filed renewable resource applications for the Gallagher to Twining Clean Solar ProjectJ3274 is a 290 MW photovoltaic generation interconnection request in Ogemaw County, Michigan. Delivers 290 MWac of clean utility solar electricity across northern lower Michigan. Represents an estimated 310 million USD clean power infrastructure development. Interconnects to regional 138 kV transmission circuits under MISO oversight. Injects emission-free power into the Michigan lower peninsula grid while generating local tax revenues. Timeline: planned project targeting commercial operation in November 2028 (estimated) under MISO interconnection queue and state regulatory schedules.Ogemaw, MI. The grid operator lists its queue status as Active. The requested in-service date is 2028-11-01; this is a planning date. The point of interconnection is GALLAGHER - TWINING 138.0kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Đã chỉnh sửabởi @ThePinGang
… lower peninsula grid while generating local tax revenues. Timeline: planned project targeting commercial operation in November 2028 (estimated) under MISO interconnection queue and state regulatory schedules.
Ảnh của độc giả, tách biệt với phương tiện có nguồn của ghim. Hãy chấm điểm món bạn đã ăn hoặc thấy, và với ghim nhà hàng, gắn thẻ món ngay trên ảnh của bạn.
Mục đầu tiên luôn là nguồn của ghim. Độ tin cậy tổng thể là trung bình có trọng số về mức độ mỗi tài liệu ủng hộ thời điểm bắt đầu và kết thúc được dùng ở trên; một tài liệu được tính giảm một nửa cho mỗi 180 ngày cũ hơn tài liệu mới nhất.
Thiếu hay sai điều gì? Hãy nói bằng lời của bạn: một liên kết củng cố ghim này, một ngày bắt đầu hoặc kết thúc khác kèm lý do, hoặc một thông tin còn thiếu hay sai. AI đối chiếu với các nguồn của ghim này, tìm nguồn tốt hơn và thêm mọi trang ủng hộ bạn. Các nguồn của chính ghim vẫn được tính nhiều nhất. Hình ảnh thể hiện nội dung khác hoặc thể hiện kém cũng được xem xét, rồi bị hạ xuống hoặc thay thế.
Tiêu đề gốc: Gallagher to Twining: 290 MW Solar Interconnection Request J3274
Power generation290 MW · J3274: 290 MW requested photovoltaic generation. Queue status: Active. Requested date: 2028-11-01. Not current measured generation; No annual energy or battery MWh inferred. · source