Đã công bố
Energy: photovoltaic generation · Kiểm tra 2026-10-30
Chỉ giai đoạn được báo cáo được đánh dấu. Số liệu và ngày tháng phân biệt kế hoạch với kết quả đã chứng minh.
150 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Fayetteville Bee Hollow Road 138 kV Substation","summerNetMW":150.0”
2025-06-30; requested date only, not an achieved opening.
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Fayetteville Bee Hollow Road 138 kV Substation.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Ghim này theo sát tin tức: nó cho thấy những gì hiện đã biết, và đây là điều đã thay đổi cùng nguyên nhân.
Đã chỉnh sửabởi @ThePinGang
MISO regional transmission interconnection development of the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Providing 150 MWac of renewable power, the utility-scale solar project feeds into Ameren Illinois transmission lines to power metro-east Illinois communities with clean, locally generated electricity.IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date.
Invenergy progressed development filings for the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Generates 150 MWac of clean photovoltaic power across the metro-east St. Louis region. Represents an estimated 170 million USD renewable infrastructure investment. Connects to Ameren Illinois transmission lines along the State Route 15 corridor. Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date. The point of interconnection is Fayetteville Bee Hollow Road 138 kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
Đã chỉnh sửabởi @ThePinGang
… Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.
Ảnh của độc giả, tách biệt với phương tiện có nguồn của ghim. Hãy chấm điểm món bạn đã ăn hoặc thấy, và với ghim nhà hàng, gắn thẻ món ngay trên ảnh của bạn.
Mục đầu tiên luôn là nguồn của ghim. Độ tin cậy tổng thể là trung bình có trọng số về mức độ mỗi tài liệu ủng hộ thời điểm bắt đầu và kết thúc được dùng ở trên; một tài liệu được tính giảm một nửa cho mỗi 180 ngày cũ hơn tài liệu mới nhất.
Thiếu hay sai điều gì? Hãy nói bằng lời của bạn: một liên kết củng cố ghim này, một ngày bắt đầu hoặc kết thúc khác kèm lý do, hoặc một thông tin còn thiếu hay sai. AI đối chiếu với các nguồn của ghim này, tìm nguồn tốt hơn và thêm mọi trang ủng hộ bạn. Các nguồn của chính ghim vẫn được tính nhiều nhất. Hình ảnh thể hiện nội dung khác hoặc thể hiện kém cũng được xem xét, rồi bị hạ xuống hoặc thay thế.
Tiêu đề gốc: Bee Hollow: 150 MW Solar Interconnection Request J1311
Power generation150 MW · J1311: 150 MW requested photovoltaic generation. Queue status: Done. Requested date: 2025-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source