NLC India Limited’s published video presenting NUPPL’s 1,980 MW Ghatampur Supercritical Thermal Power Project. Publisher and title verified through YouTube’s public metadata.
India’s May 30, 2025 government release publishes total project cost ₹21,780.94 crore (INR217,809,400,000) for three 660 MW units, totaling 1,980 MW. The budget covers the full three-unit built project, not just the first unit inaugurated that day. Ghatampur thermal power project: published generating capacity 1980 MW. Operator-reported electric generating capacity; not annual energy production Unit 1 was dedicated May 30, 2025; the remaining units were physically being completed with FY2025–26 commissioning targets. Later inventory records report two recent operating units; the full project is retained as construction/recent operation, without asserting a completion day for Unit 3.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Ghatampur thermal power project — recent operation / commissioning
印度政府2025年5月30日的发布稿公布,三台660 MW机组(合计1,980 MW)的项目总成本为₹21,780.94 crore(INR217,809,400,000)。该预算涵盖整个三机组已建成项目,而不仅是当天落成的第一台机组。[3]
印度政府2025年5月30日的发布稿公布,三台660 MW机组(合计1,980 MW)的项目总成本为₹21,780.94 crore(INR217,809,400,000)。该预算涵盖整个三机组已建成项目,而不仅是当天落成的第一台机组。Ghatampur火电项目:公布的发电容量为1980 MW。运营商报告的发电装机容量;并非年发电量。1号机组于2025年5月30日落成;其余机组仍在实体建设收尾,目标是在2025–26财年投入调试。后续库存记录显示有两台机组近期投运;整个项目仍按建设中/近期投运处理,不对3号机组的完工日期作出断言。[3]
仅保留有实体施工、调试或2025–2026年投运记录,且已公布项目专属成本和电力输出的项目。成本采用已公布的范围和货币;不使用基准估算或货币换算。MW为功率容量,而非年发电量。如有预期年发电量,则为预测值。地图上的点为所报告的电厂/项目位置,可能为大致位置。匹配的清单视图和被排除的扩建提案不属于可叠加的容量。
NLC India Limited发布的视频,介绍NUPPL的1,980 MW Ghatampur超临界火电项目。发布者和标题已通过YouTube公开元数据核实。图片来源: NLC India Limited。来源与图库;原始媒体。