第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
Opened primary project evidence supporting buildout metrics, physical stage and timeline; researched 2026-10-30.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
Reported operation 2025-08. Inventory month precision does not establish a specific day.
EIA reports (OP) Operating. A planned operation date is not evidence of commercial service.
“(OP) Operating”
Technology: Solar Photovoltaic. Plant 68455; selected generator IDs GIBBY. Scope is the named solar generating component, not unrelated units at the site.
“Solar Photovoltaic”
Reported commercial-operation month
原标题: Gibson Solar: 200 MW Operating Since August 2025, per EIA
Power generation200 MW · 200 MW electrical generation nameplate reported operating in September 2026. Reported operation month 2025-08. Scope: GIBBY. Annual output is not reported by this inventory; no annual energy inferred. · source