OCI Energy is constructing the 240M USD, EIA plant 68349 lists Avant Prairie ESS LLC’s Freestone County battery at 200 MW / 800 MWh four-hour utility-scale battery energy storage system in Freestone County, Texas, delivering critical reliabilitywith July 2029 target and approvals not initiated. Later ERCOT request 27INR0316 reports 201.72 MW and frequency regulation to the ERCOT grid.April 16, 2029 projected COD; OCI lists Avant Prairie in its development portfolio.
OCI Energy secured ERCOT interconnection placement 24INR0432 for the Avant Prairie ESS facility. Features 200 MW / 800 MWh of lithium iron phosphate battery storage capacity engineered for 4-hour continuous discharge. Represents an estimated 240 million USD private clean energy capital commitment in east-central Texas. Connects directly to the Oncor 345 kV high-voltage transmission backbone near the Big Brown substation corridor. Mitigates bulk transmission congestion and provides dynamic voltage support during peak power demand conditions.shows completed screening/full study but no IA, at a Big Brown–Jewett 345 kV tap. It is not a construction finding. The old $240M, 800 MWh, four-hour and September 2028 COD lack opened support. Native capacity cites EIA 200 MW separately from queue 201.72 MW. Timeline: planned project targeting commercial operation in September 2028 (estimated) under ERCOT interconnection queue and state regulatory schedules.April 16, 2029 is later ERCOT projected COD, versus EIA July 2029. It is not confirmed operation.
已编辑由 @ThePinGang
… dynamic voltage support during peak power demand conditions. Timeline: planned project targeting commercial operation in September 2028 (estimated) under ERCOT interconnection queue and state regulatory schedules.
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Avant Prairie ESS: 200 MW EIA Plan, 2029 Queue Target
Power storage200 MW · EIA plant 68349 battery nameplate 200 MW; ERCOT later queue reports 201.72 MW, unresolved basis. · source