Energy: photovoltaic generation · 核查日期 2026-10-30
仅突出显示已报告的阶段。数据和日期区分规划与已验证状态。
150 MW photovoltaic generation request; preliminary interconnection scope, not measured output.
“"poiName":"Fayetteville Bee Hollow Road 138 kV Substation","summerNetMW":150.0”
2025-06-30; requested date only, not an achieved opening.
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
Done; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Done","sisPhase1":"","postGIAStatus":"Not Started"”
Solar; Fayetteville Bee Hollow Road 138 kV Substation.
“"fuelType":"Solar","facilityType":"Photovoltaic"”
Interconnection request received
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"J1311","queueDate":"2019-04-29T04:00:00+00:00","inService":"2026-06-30T04:00:00+00:00"”
这个标记会跟进新闻:它显示目前已知的情况,这里列出改了什么以及起因。
已编辑由 @ThePinGang
MISO regional transmission interconnection development of the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Providing 150 MWac of renewable power, the utility-scale solar project feeds into Ameren Illinois transmission lines to power metro-east Illinois communities with clean, locally generated electricity.IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date.
Invenergy progressed development filings for the Bee Hollow Clean Solar CenterJ1311 is a 150 MW photovoltaic generation interconnection request in St. Clair County, Illinois. Generates 150 MWac of clean photovoltaic power across the metro-east St. Louis region. Represents an estimated 170 million USD renewable infrastructure investment. Connects to Ameren Illinois transmission lines along the State Route 15 corridor. Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation IL. The grid operator lists its queue status as Done. The requested in-service date is 2025-06-30; this is a planning date. The point of interconnection is Fayetteville Bee Hollow Road 138 kV Substation. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
已编辑由 @ThePinGang
… Supplies emissions-free electricity under long-term power purchase agreements. Timeline: planned project targeting commercial operation in November 2026 (estimated) under MISO interconnection queue and state regulatory schedules.
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Bee Hollow: 150 MW Solar Interconnection Request J1311
Power generation150 MW · J1311: 150 MW requested photovoltaic generation. Queue status: Done. Requested date: 2025-06-30. Not current measured generation; No annual energy or battery MWh inferred. · source