150 MW
2024-05-13
Interconnection study; construction and operation unverified
Bergen 138 kV; Juno Power Management LLC
“Juno Power Management LLC”
Interconnection study published; not a commissioning date
这个标记会跟进新闻:它显示目前已知的情况,这里列出改了什么以及起因。
已编辑由 @ThePinGang
Jupiter Power development of the Two Rivers Clean Energy Storage Center in Kearny, PJM’s 2024-05-13 study identifies request AF2-415 as a proposed 150 MW battery-storage facility in Hudson County, New Jersey. Delivering 150 MW / 600 MWh of battery energy storage at the confluence of the Hackensack and Passaic Rivers, the project connects to the PJM 230 kV grid to support northern New Jersey decarbonization.The study does not establish commercial operation.
Jupiter Power advanced PJM interconnection and local permitting for the Two Rivers Clean Energy Storage Center in Hudson County, New Jersey. Delivers 150 MW / 600 MWh of modular utility-scale lithium iron phosphate battery storage capacity. Represents an estimated 170 million USD private clean energy investment on the South Kearny industrial peninsula. Connects directly to the high-voltage PSE&G 230 kV transmission hub serving northern New Jersey. Enhances urban grid reliabilityThe primary study supports request AF2-415, its location and stores off-peak renewable energy for peak-demand dispatch. Timeline: planned 150 MW utility-scale batterypower rating. It does not establish the former construction budget, a four-hour storage project targeting commercial operation in December 2028 (estimated) per PJM generator interconnection queue and Jupiter Power filings.duration or a current opening target. Interconnection upgrade costs are not the full battery-project budget.
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Two Rivers Storage: 150 MW PJM Storage Request AF2-415
Power storage150 MW · Proposed battery maximum facility output in MW; no verified MWh duration or commercial-operation day. · source