第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
Active interconnection request; queue status does not establish physical construction or commercial service.
“A proposed new Generating Facility”
Battery Storage; Gardenville - Dunkirk Line 74 230 kV.
“Gardenville - Dunkirk Line 74 230 kV”
Interconnection request received
Requested in-service date
原标题: Lighthouse Energy Storage: 250 MW Battery Interconnection Request C24-074
Power storage250 MW · C24-074: 250 MW requested battery storage. Queue status: Active interconnection request. Requested date: 2030-07-01. Not current measured generation; No annual energy or battery MWh inferred. · source