Energy: photovoltaic generation · 核查日期 2026-10-29
仅突出显示已报告的阶段。数据和日期区分规划与已验证状态。
75 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output.
“Caverns Solar Map Map FL Jackson FPL IPP Non-CHP CVSO 75 75 75 Solar Photovoltaic SUN PV”
Planned operation 2029-12; preliminary survey estimate, not a capacity commitment or achieved milestone.
“12 2029 (L) Regulatory approvals pending. Not under construction”
EIA reports (L) Regulatory approvals pending. Not under construction. A planned operation date is not evidence of commercial service.
“(L) Regulatory approvals pending. Not under construction”
Technology: Solar Photovoltaic. Plant 68331; selected generator IDs CVSO. Scope is the named solar generating component, not unrelated units at the site.
“Solar Photovoltaic”
Reported operation forecast
“12 2029 (L) Regulatory approvals pending. Not under construction”
这个标记会跟进新闻:它显示目前已知的情况,这里列出改了什么以及起因。
已编辑由 @ThePinGang
The Caverns Solar Project is a 75 MWac photovoltaic facility planned across rural agricultural acreage near Marianna and Florida Caverns State Park75 MW solar PV plant in Jackson County, Florida. Permitted under the Florida Department of Environmental Protection (DEP) environmental resource frameworkFlorida, listed in EIA-860M data with operator CVSO, LLC and interconnecting into the Florida Panhandle 115 kV transmission network, the single-axis tracking solar array provides clean, renewable wholesale power to rural electric cooperatives and municipal utilities.a proposed completion of December 2029. No developer announcement or site was found.
Nameplate capacity:Planned 75 MWac utility-scale single-axis trackingMW solar photovoltaic installation. Acreage: Encompasses approximately 580 acres of rural timberland and pasture north of MariannaPV plant in Jackson County. Transmission tie: Interties with the regional 115 kV bulk power transmission line in northwestCounty, Florida. Environmental conservation: Engineered with designated vegetative buffer zones to preserve local hydrology. Clean generation: Expected to generate approximately 155,000 MWh of zero-carbon power annually. Timeline: Commercial operation targeted forOperator listed as CVSO, LLC; proposed completion December 2029 following site preparation and electrical interconnection.2029.
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
Interconnection.fyi 和 Cleanview[2] 显示的 EIA-860M 提议日期(2029 年 12 月);没有确定的日期。
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Caverns Solar: 75 MW solar PV, Jackson County, Florida
Power generation75 MW · 75 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output. Operation forecast 2029-12. Scope: CVSO. Annual output is not reported by this inventory; no annual energy inferred. · source