Construction research 2026-10-24: Epoch’s[1] 2026-05-18 observation documents remaining physical construction/installation for this named buildout. In Progress does not complete earlier operating buildings or future capacity. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Source quote: “there is still light work around the building” Dated observation 2026-05-18; future trajectory rows and modeled costs are distinguished from this physical milestone.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
| 2026-03-12 | 5号楼安装了更多冷却塔,但尚未完成,屋顶也已基本完成。 |
|---|
| 2026-05-18 | 5 号楼已安装所有冷却塔,所有其他组件看起来都已完成,但建筑物周围仍有少量工作。据此,我们预计还需要 3 个月的时间才能投入运营。 |
|---|
Epoch AI 卫星图像注释,按日期顺序排列。 · 来源
Physical-stage observation dated 2026-05-18. Campus buildout remains under construction; already operating buildings do not complete the remaining work. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“there is still light work around the building”
Epoch’s dated 2026-05-18 assessment: there is still light work around the building Campus buildout remains under construction; already operating buildings do not complete the remaining work.
“there is still light work around the building”
Epoch estimates AI hardware: Google TPU v5e, Google TPU v5p, and Google TPU v6e chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Google TPU v5e, Google TPU v5p, and Google TPU v6e chips.”
Epoch dated observation: Building 1 is operational.
“Building 1 is operational.”
Epoch dated observation: Building 5 has all cooling towers installed, and all other components…
“Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building.”
原标题: Google New Albany AI Data Center Buildout
位于美国俄亥俄州新奥尔巴尼的 Google New Albany 是由 Google / Google DeepMind 运营的前沿 AI 数据中心园区,电力容量达到 333 MW,拥有 323,901 个 H100 等效 AI 加速器。 0
Epoch 2026 年 5 月 18 日的观察记录了这个命名扩建项目的剩余物理施工/安装情况。 进行中并不完成早期运营的建筑物或未来的容量。 功率和加速器数量仍然是 Epoch 的估计值,而不是运营商认证的评级。 建模的 2025 美元资本成本包括计算硬件,而不是源本地建设预算。