读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
The source explicitly dates this event.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
Ontario Hydro places Unit 2 in long-term shutdown; it will remain idle until the 2012 recovery.[1]
848 MW electrical capacity. Historical generating capacity; not a claim about current output. Calendar-1995 electricity supplied: 3,791 GWh (annual energy, not instantaneous output).[1]
Cost: not assigned. No event-specific published construction/restart budget was verified. Financing, damages and other phases are not substituted.
Photo: Bruce Power. Bruce A Unit 3, from the operator’s 2022 annual report. This provides Bruce A station context and does not depict Unit 1 or Unit 2 restart work. Source and credit.
Power generation848 MW · 848 MW electrical capacity. Historical generating capacity; not a claim about current output. Calendar-1995 electricity supplied: 3,791 GWh (annual energy, not instantaneous output). · source