仅突出显示已报告的阶段。数据和日期区分规划与已验证状态。
About 239,887 sq ft
“roughly 239,887 square feet of gross building area”
Roughly 1.75 acres at 4620 Pacific Highway, Old Town
“The development spans roughly 1.75 acres at 4620 Pacific Highway”
223 units in a seven-story building, 33 of them affordable (20 very-low-income, 13 moderate-income)
“City filings keep the count at 33 set-aside affordable units, with 20 reserved for very-low-income households and 13 for moderate-income households.”
November 19, 2025, per contractor social posts (no official date published)
“contractor social posts pointed to a November 19, 2025 ground-breaking”
Under construction; no final completion date posted
“With construction underway and no final completion date posted”
Perry's Cafe opens
“since it opened at 4620 Pacific Highway in Old Town back in March 1985”
Cafe's final service announced
“the cafe announced its final service in August 2024”
Groundbreaking (contractor posts)
“contractor social posts pointed to a November 19, 2025 ground-breaking”
Estimated completion (delivery)
“Zephyr is building 223 apartments on the former Perry's Cafe site in San Diego's Old Town, with delivery slated for early 2028.”
“At this point, the applicant has three years to utilize the Neighborhood Development Permit and apply for construction permits,” city spokesman Richard Berg told NBC 7.
neighbors raised concerns about the project’s scale, traffic, noise and air quality, and opposition groups filed an appeal during the entitlement process.
We hope the new apartment building is successful in being able to preserve that feature of the original building destined to remain for repurposing
Your loyalty and patronage have meant the world to us and it has truly been our pleasure to serve you.
The place held an affectionate spot in our hearts.
| The cafe family's farewell sign (NBC 7 San Diego) · 2024年7月24日 | 0.60 |
|---|---|
| A favorite local restaurant to close (Linda Vista Update) · 2024年7月25日 | 0.20 |
| City spokesman Richard Berg on the permit (NBC 7 San Diego) · 2024年8月6日 | 0.00 |
| Perry's Cafe closes for good (San Diego Sun) · 2024年8月6日 | 0.50 |
| Neighbors' concerns and the appeal (Hoodline, AI-assisted) · 2026年7月1日 | -0.50 |
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
Hoodline[4] reports contractor social posts pointing to a November 19, 2025 groundbreaking; the developer has not published an official start date, and no completion date has been posted.
Summary states Zephyr is building 223 apartments with delivery slated for early 2028 (article published 2026-08-03).[1]
Project directory page carrying Zephyr's rendering used as the lead image.[1]
AI-assisted article; source for the 1.74-acre parcel, 239,887 sq ft, 2025 mobilization and the November 19, 2025 groundbreaking inferred from contractor posts.[1]
Search snippet reports the conversion is under way with completion targeted for early 2028; page itself could not be opened.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
No construction budget has been published. The only published figure is the roughly $9 million land purchase in 2024, which is not the cost of the building, so the pin carries no price.
The lead image is Zephyr's rendering of the project as published by BuildSD.
[3]