据en.wikipedia.org,这是作为目标而非固定日期给出的:“…n installed. Dogger Bank[4] B wind farm is expected to be complete in 2027. As of 27 July 2026, SSE rep…”
Whole three-phase 3.6 GW farm; 2021 investment figure, no final audited cost found.[1]
Same project/site; inventory records are an additional source view, not additive capacity on top of existing pin figures.[1]
Dogger Bank's own project site likewise describes the 3.6GW, three-phase wind farm under construction but gives no target completion date, leaving the pin's estimated June 2027 date unconfirmed by this particular page.
SSE Renewables' own project page confirms Dogger Bank[4] as the 'world's largest offshore wind farm' under construction, noting its first turbines began generating power in October 2023, but states no overall completion date - consistent with the pin's own estimated framing for mid-2027.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Dogger Bank Wind Farm Complete
GEM 2026年8月快照:多阶段混合。已公布各阶段额定容量之和为3720 MW(额定值可能混用光伏直流/交流)。技术:风电。[3]
在合并各来源数据前,请比较阶段覆盖范围以及交流/直流、铭牌和净额定值。此清单视图不是应加到现有项目总量上的额外容量。
补充来源视图;在合并数据前,请比较阶段覆盖范围和额定值约定。