JPMorgan Chase held a ribbon-cutting for its new Norman Foster-designed global headquarters, a supertall replacement for the demolished Union Carbide Building.
JPMorganChase opened its new 60-story, 2.5 million sq ft global headquarters at 270 Park Avenue on 21 October 2025, with Jamie Dimon, Gov. Kathy Hochul and Lord Norman Foster at the ribbon cutting[2][3]
The building is designed for 10,000 employees and cost about $3 billion; construction employed 8,000 workers[2][3]
It is the city's largest all-electric tower, targeting net zero operational emissions on hydroelectric power, and about 97% of the old building's demolition materials were recycled[2][3]
Features include eight trading floors, 285,000 sq ft of client entertainment space, 2.5 times more outdoor public space and a public plaza on Madison Avenue[2]
The bank pitches it as a recruitment tool, with biometric access, a building app, a drone port and extensive hospitality space[3]
The Spiral, 66 Hudson Boulevard East, Manhattan, New York, United StatesTishman Speyer
已确认可信度 89%2.9年前Happened as dated, per the source[1]: "The Spiral — a 2.8-million-square-foot office skyscraper located at 66 Hudson Blvd. in Manhattan — has officially opened," reported in November 2023.
Bjarke Ingels Group's The Spiral, a 314-metre office tower wrapped in cascading green terraces, opened at 66 Hudson Boulevard as Pfizer's new global headquarters.
已确认可信度 84%2.1年前Happened as dated, per the source[1]: "opened on August 15, 2024".
The Clippers' new $2BN Intuit Dome arena opened in Inglewood on August 15, 2024, giving the team its first standalone home after decades sharing a venue with the Lakers.
1 Wall Street, Financial District, Manhattan, New York, United StatesMacklowe Properties
已确认可信度 90%3.6年前Happened as dated, per the source[1]: "the building obtained its certificate of temporary occupancy, and the first residents were scheduled to move in the following week."
Macklowe Properties finished converting the Art Deco One Wall Street office tower into 566 apartments, the largest office-to-residential conversion completed in New York City.
已确认可信度 87%6.7年前Happened as dated, per the source[1]: "220 Central Park South was completed in 2019," with first residents moving in during 2018.
220 Central Park South, a limestone-clad tower on Manhattan's Billionaires' Row, completed as one of the most profitable condo buildings ever built, breaking from the glass-tower norm.
已确认可信度 84%10.8年前Happened as dated, per the source[1]: "Year of Completion: 2015."
Harry Macklowe's 432 Park Avenue, then the world's tallest residential tower, officially completed in Manhattan in December 2015 after four years of construction.
预估可信度 50%1.6年后Houston First[1] says the fully financed first phase is "on schedule to open in May 2028", a month rather than a day.
A 700,000-square-foot building joined to the George R. Brown Convention Center, holding two exhibition halls, an atrium hall and the largest ballroom in Texas, plus a 100,000-square-foot pedestrian plaza linking it to the Toyota Center. Houston First financed this first phase of its $2 billion convention district transformation with about $1.38 billion of hotel occupancy tax and special revenue bonds.
Obama Presidential Center, Jackson Park, Chicago, IllinoisObama Foundation
已确认可信度 82%96天前The Obama[1] Foundation's grand opening FAQ says "the public will be able to start visiting the campus and Museum on June 19, 2026", a fixed day that has now passed.
The Obama Foundation's 19.3-acre campus in Jackson Park, built around a 225-foot museum tower, took its first visitors on Juneteenth, the day after a dedication ceremony at John Lewis Plaza. At roughly $850 million it is the most expensive presidential library yet built; ground was broken in September 2021 after years of lawsuits over the Jackson Park site.
100 Century Avenue, Pudong, Shanghai, ChinaMori Building
已确认可信度 85%18.1年前Happened as dated, per the source[1]: "The building finished at long last in 2008."
The Shanghai World Financial Center opened in 2008 after developers were forced to redesign its circular summit opening into a trapezoid when the public read it as a Japanese flag.
224 Western Avenue, Allston, Boston, MA 02134, United StatesHarvard University
已确认可信度 90%92天前The developers' release says they "were joined on June 23 by Mayor Michelle Wu" to celebrate the opening.[1]
Harvard, Tishman Speyer and Breakthrough Properties cut the ribbon on the first phase of the Enterprise Research Campus in Allston: two commercial laboratory buildings called OneMilestone, the 343-apartment Verra, the Atlas Hotel, Harvard's David Rubenstein Treehouse conference centre, 40,000 square feet of retail and more than two acres of public open space. It is the opening move on a 36-acre site, with a Phase B of labs, offices and housing still to be permitted.
已确认可信度 90%11.5年前Happened as dated, per the source[1]: "Today we moved into our new Facebook building in Menlo Park, California."
Facebook employees moved into MPK 20, a Frank Gehry-designed office building topped by a nine-acre rooftop park, expanding the company's Menlo Park headquarters.
预估可信度 62%1.9年前The pin's event is the topping out, which New York YIMBY[3] and Connect CRE both reported on 24-25 October 2024 and which Wikipedia[2] gives as October 2024. The previous date of 1 June 2026 was Wikipedia's estimated completion date, not the topping out. No source gives the exact day, so this is dated to the last day of that month as an estimate.
A 1,001-foot Kohn Pedersen Fox supertall at 520 Fifth Avenue, one of the first new Manhattan skyscrapers in decades built with a masonry-style terracotta facade instead of glass.