建设中
Digital infrastructure: AI data center · 核查日期 2026-10-29
仅突出显示已报告的阶段。数据和日期区分规划与已验证状态。
More than USD 800 million as reported in the owner’s fact sheet.
More than 1,200 at peak construction and approximately 100 operational jobs after completion; distinct populations, not additive.
“Skilled trade workers on site at peak construction 1,200+”
715,000 sq ft.
“715,000-square-foot data center”
Spring 2027 in the August 2024 state announcement; not verified opening.
“operational in spring 2027”
Project announcement
“today announced it is establishing”
Opening forecast
“operational in spring 2027”
这个标记会跟进新闻:它显示目前已知的情况,这里列出改了什么以及起因。
已编辑由 @ThePinGang
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
动工年份:根据公布的年份、月份或季节作出的大致日历定位;所选日期仅为占位日期,并非经核实的事件日期。这不是开业日期。
State announcement: $800M investment, 100 jobs.[1]
Aiken County, South Carolina: groundbreaking year 2024.[1]
Opened primary project source for sourced buildout metrics and project timeline; researched 2026-10-29.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: Meta data centre — Aiken County, South Carolina — under construction
Meta的站点专属信息表将Aiken County, South Carolina数据中心描述为一处即将建成的设施。全球目录记录的动工时间为2024年;未找到已确认的开业日期。[1][3]
时间线:动工年份:根据公布的年份、月份或季节作大致的日历定位;所选日期仅为占位,并非经核实的事件日期。这不是开业日期。
地图位置:位置为大致所在区域;坐标并非经测绘的设施入口。