Ferrol Cruise Port's New Passenger Terminal Opens
预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 70%总体可信度: 70%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 5 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度为 50%–74% 的图钉Estimated: the article gives the terminal as opening in "Spring 2027", with construction only due to begin in 2026; dated to the end of spring, 20 June 2027.[1]
Global Ports Holding will build and run a 30-year-concession cruise terminal on Ferrol's outer quay in Galicia, with first-phase operations planned for the 2027 cruise season. Phase one is a 480 sq m terminal on a 960 sq m site.
1.00