NV Energy's 525-kV Greenlink West Line Targets In-Service
预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 69%总体可信度: 69%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 4 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度为 50%–74% 的图钉Estimated: Utility Dive[1] reports service is "targeted for May 2027", an older target than the April 2026 headline "expected to come online in mid-2027"; dated to 31 May 2027.
Greenlink West is a roughly 350-mile 525-kV transmission line from Las Vegas to Yerington, Nevada, with NV Energy targeting service in May 2027. Later coverage still describes it as coming online in mid-2027.
1.00